POLSON — After a review of last week’s minutes,
county commissioners and representative engineers and contractors
discussed the following:
- The “B” canal is being replaced with a 36-inch
concrete pipe.
- Curb and gutter installation is continuing with
paving to start next week.
- Top soil is expected to be spread prior to the
winter shut down.
- The Mission View Drive portion of the project will
begin early November.
Labeled “Phase 2A,” the lowering of Skyline Drive and
utility re-locations and the roughing in of New Mission View Drive
are three steps expected to be completed this year.
Also, this is a reminder that Skyline Drive will be
completely closed to all traffic Nov. 14 through Dec. 4 at Caffrey
and Skyline North to Skyline and “A” canal. The unhindered removal
of the old bridge and construction of the new bridge necessitates
the closure.
Residents can check the county website for more
details and maps.
ARTICLES BY LAKE COUNTY COMMUNITY DEVELOPMENT CORPORATION
TIGER/Skyline Drive update
POLSON — Crews from LSJ Jensen have been working on the final Phase 1 and 2A contract items which consist of landscaping, paving, water service installation, and clean-up. Paving is expected to be completed this week and will conclude Phase 1 of the project.
TIGER/Skyline Drive Project Weekly Update
TIGER/Skyline Drive Update
POLSON — Phase 1: The new bridge is mostly complete and open for traffic. The site is still under construction and a 10 m.p.h. speed limit is in effect. Motorists are asked to use caution driving across the bridge as the loose gravel is not conducive to high speed travel. Removal of the bypass bridge is underway with completion by Dec. 31, weather permitting.