Grant County unemployment remains at 10-year low
CHERYL SCHWEIZER | Hagadone News Network | UPDATED 8 years, 11 months AGO
Senior Reporter Cheryl Schweizer is a journalist with more than 30 years of experience serving small communities in the Pacific Northwest. She began her post-high-school education at Treasure Valley Community College and enerned her journalism degree at Oregon State University. After working for multiple publications, she has settled down at the Columbia Basin Herald and has been a staple of the newsroom for more than a decade. Schweizer’s dedication to her communities and profession has earned her the nickname “The Baroness of Bylines.” She covers a variety of beats including health, business and various municipalities. | September 28, 2017 1:00 AM
OLYMPIA — Grant County’s unemployment rate dropped by more than a percentage point between August 2016 and August 2017. But unemployment did edge up slightly between July and August.
The unemployment rate was the lowest for August since 2004, wrote Don Meseck, regional labor economist for the Washington Employment Security Department.
The unemployment rate fell from 6.3 percent in August 2016 to 4.9 percent in August 2017. “The civilian labor force expanded modestly while the number of unemployed residents decreased sharply,” Meseck wrote.
The unemployment rate was 4.6 percent in July 2017.
Grant County’s nonfarm employment rate grew by 1.8 percent between the Augusts, which was slower than the statewide growth of 2.5 percent in the same time frame. Grant County “labor force growth rates have lagged statewide growth rates in 28 of the past 29 months, April 2015 through August 2017. Nevertheless, the local unemployment rate has declined each of the past 11 months primarily because the number of unemployed has contracted substantially,” Meseck wrote.
The number of Grant County unemployed dropped from 2,930 residents in August 2016 to 2,344 in August 2017, “meaning that 586 fewer Grant County residents were out of work during this time frame.”
There was good news in nondurable goods manufacturing, but bad news in durable goods manufacturing. In Grant County nondurable goods jobs mostly are in food processing, and the sector grew by 7 percent (220 jobs) between August 2016 and August 2017. The nondurable goods sector “has been faring well over the last couple of years,” Meseck wrote, growing for 12 of the last 13 months, counted year over year.
But durable goods manufacturing lost 110 jobs in the same time period. In Grant County, that sector of the economy has lost jobs for the 22 consecutive months, counting year over year.
The “mining, logging and construction” sector is mostly construction in Grant County. It lost 20 jobs between June 2016 and June 2017. Wholesale trade lost 200 jobs between the Augusts, and “transportation, warehousing and utilities” lost 140 jobs in that same time frame.
The news was better in the professional and business services sector, which added 250 jobs between August 2016 and August 2017. The retail trade sector added 130 jobs, a 3.8 percent increase, and the leisure and hospitality sector added 210 jobs, a 7.9 percent increase.
Cheryl Schweizer can be reached via email at [email protected].
ARTICLES BY CHERYL SCHWEIZER
Road projects continue as September approaches
QUINCY — The dirt is flying on A Street Northeast in Quincy. Construction crews were moving excavated soil and compacting the roadbed Thursday morning. A Street Northeast is being completely rebuilt from the intersection with Third Avenue Northeast to Sixth Avenue Northeast. The section of Sixth Avenue to the intersection to B Street Northeast is part of the project also.
Roundabout, sidewalks, road rebuilds part of Othello six-year street plan
OTHELLO — A roundabout at the intersection of SR 26 and South 14th Avenue is the top priority for Othello city officials, with the goal of construction in 2029. The project is part of the city’s annual six-year street plan approved by the Othello City Council Monday. Othello Public Works Director Robin Adolphsen said the plan can be amended as needed.
Next phase of Othello water project to start in about two weeks
OTHELLO — There’s at least one more test, but when it’s completed, the city of Othello should be ready to build the first phase of a facility that will treat water from irrigation canals to municipal use standards.