Friday, January 31, 2025
32.0°F

Ready to open: Confluence Health is growing in Moses Lake; 7,000-square-foot clinic complete

CHERYL SCHWEIZER | Hagadone News Network | UPDATED 3 years, 7 months AGO
by CHERYL SCHWEIZER
Senior Reporter Cheryl Schweizer is a journalist with more than 30 years of experience serving small communities in the Pacific Northwest. She began her post-high-school education at Treasure Valley Community College and enerned her journalism degree at Oregon State University. After working for multiple publications, she has settled down at the Columbia Basin Herald and has been a staple of the newsroom for more than a decade. Schweizer’s dedication to her communities and profession has earned her the nickname “The Baroness of Bylines.” She covers a variety of beats including health, business and various municipalities. | June 24, 2021 1:07 AM

MOSES LAKE — A new Confluence Health facility opens for patients Monday.

Gregg Fletcher, vice president for the Confluence Health-Moses Lake Clinic, said Confluence outgrew its Hill Street clinic.

“By moving those providers here, it frees up some space at our main clinic,” he said. “It gives us some space at the main clinic to recruit for primary care (medical providers).”

Fletcher said the new, 7,000-square-foot clinic on Yonezawa Boulevard initially will house physicians in three specialties.

“Our general surgeons will be here for their outpatient work, our optometrist will be here, a visiting provider from Wenatchee for vascular surgery, and the vascular ultrasound tech will all be in this building,” Fletcher said.

Initially, the building will house four physicians, he said.

The total project cost was about $3 million, which includes construction, equipment and furnishings.

The building also will have room for other specialists who visit Moses Lake, Fletcher said.

Lane Heikel, senior project manager with Confluence Health, said it’s the first new building Confluence has built in Moses Lake in a long time.

“This is a fun project for us, because this is our first roundup (new construction) in Moses Lake since I think we first came to Moses Lake,” she said. “Brand new, not someone else’s space that we’re remodeling, not our own space that we’re remodeling — brand new from the dirt up.”

The new clinic has 12 exam rooms, Heikel said, and it was designed to provide flexibility.

“We tried to make them all standard size, fairly large in size,” Heikel said.

The building was designed to make remodeling easier as different physicians use the space. In addition, there’s more room for Confluence specialists who travel to Moses Lake to consult with patients.

“We do have room for visiting doctors to see more patients here now, because they don’t have to share just one room,” Heikel said. “We’ve got more spaces for them to all rotate through and see more people.”

“(Specialists) come different days of the week, different days of the month,” Fletcher said. “Vascular (surgery) will be here the most, but if we have somebody else who needs to move from (Moses Lake) clinic or come from Wenatchee and expand days, they can use space.”

There’s also a “procedure room,” for outpatient treatment, and a space to conduct tests, like the ultrasound. The new exam rooms are about 120 square feet.

“Much larger than what they’re working out of right now,” Heikel said.

It’s also better for patients, allowing more room for them to bring someone with them, she said. The lobby has big windows, high ceilings and features a lot of wood.

“I love the wood ceilings,” Heikel said. “This is something new for Confluence. We don’t have a lot of natural wood in a lot of our spaces. It’s a fun showcase for us.”

photo

Cheryl Schweizer/Columbia Basin Herald

The new Confluence Health facility in Moses Lake is scheduled to open Monday.

photo

Cheryl Schweizer/Columbia Basin Herald

Gregg Fletcher, Confluence Health-Moses Lake Clinic vice president, at the reception desk of the new Confluence Health facility in Moses Lake, scheduled to open Monday.

MORE FRONT-PAGE-SLIDER STORIES

New blood draw room at Confluence Health
Columbia Basin Herald | Updated 11 years, 4 months ago
Confluence is building a $3 million clinic in Moses Lake
Columbia Basin Herald | Updated 4 years, 1 month ago
Medical treatment options expanding
Columbia Basin Herald | Updated 3 years ago

ARTICLES BY CHERYL SCHWEIZER

Revised Washington law makes it easier for youth to get identification
January 31, 2025 1:50 a.m.

Revised Washington law makes it easier for youth to get identification

OLYMPIA — It will be easier for young people 16-18 years of age to get a Washington identification card without a parent’s or guardian’s signature under revisions to ID laws that took effect Jan. 1.

Negligent driving law revisions add penalties in some cases
January 31, 2025 1:20 a.m.

Negligent driving law revisions add penalties in some cases

MOSES LAKE — Drivers will be subject to new penalties if they are charged with negligent driving in collisions that involve people who aren’t in a car or truck.

One infrastructure project complete, others planned for Royal City
January 30, 2025 1:05 a.m.

One infrastructure project complete, others planned for Royal City

ROYAL CITY — Cross one long, long project off the list. The last section of old water line in Royal City was replaced in 2024, wrapping up a project that Mayor Michael Christensen said took a while. “Over the years we’ve been trying to upgrade our water system, and now the entire city is upgraded,” Christensen said. “That was a long time coming and it was a bit of a task.”