Odessa groundwater project receives $5.5M in state funding
STAFF REPORT | Hagadone News Network | UPDATED 2 years, 8 months AGO
RITZVILLE — The 2024 Supplemental Capital Budget for Washington includes $5.5 million in funding for the EL 22.1 Pipeline Turnout Project in the Odessa Groundwater Replacement Program, according to a Monday announcement from the EL 22.1 Landowner Association.
According to the announcement, the funds were secured by Sen. Mark Schoesler, R-Ritzville. The EL 22.1 Project will help deep well irrigators and farmers in the declining Odessa Aquifer Subarea north of Interstate 90 and east of Moses Lake by providing surface water from the East Columbia Basin Irrigation District's East Low Canal to replace groundwater pumping from the aquifer, the statement said.
The proposed EL 22.1 Project would include a new canal turnout infrastructure, a large-scale canal pump station, booster pump stations and approximately twelve miles of large-diameter pipeline to provide Columbia Basin Project surface water to various farms and properties, the statement said.
“Additionally, the EL 22.1 Landowner Association and the East Columbia Basin Irrigation District would use the above funding as a match to attract other funding sources, as we are planning to apply for Federal funding through the National Resources Conservation Service Regional Conservation Partnership Program (RCPP). Federal funds such as from the RCPP could help complete the EL 22.1 Irrigation Delivery System Project,” the statement said.
Currently, the project is 60% engineered and will be 90% engineered soon, said the announcement.
“Reaching 60% engineering is an important milestone as it means that the EL 22.1 Irrigation Delivery System Project meets all the engineering standards and requirements of the US Bureau of Reclamation,” the statement said.
More information on OGWRP can be found at ecbid.org.
ARTICLES BY STAFF REPORT
Connell woman killed in Booker Road crash
CONNELL — Charges are pending against a Kennewick man following a collision about 12 miles south of Othello that killed a Connell woman and injured three other people Tuesday evening. A Washington State Patrol press memo said intoxicating substances were a factor. Jessica Zarate, 37, Connell, was pronounced dead at the scene of the crash near the intersection of SR 17 and South Booker Road, the WSP memo said. She was driving south on Booker Road approaching the intersection when her car was hit by a pickup driven by John Reiss, 62, Kennewick. Edgar Garcia Quirino, 28, Othello, was driving north on SR 17 and ran into Zarate's car, the WSP memo said. The crash occurred at about 6:40 p.m.
Wheeler Road closed because of traffic collision
UPDATE: The road was reopened as of noon, according to a GCSO media release. MOSES LAKE — Grant County Sheriff’s Office has announced there is a road closure between Road 3-NE and Road S-NE. There was a serious traffic collision. GCSO is asking for drivers to avoid the area and find alternative routes. This is a developing story and will be updated as more information becomes available.
Doors opening: The Currents will provide homeownership for more local workers
About 104 homes are planned at the former Atlas sawmill site
Teachers, nurses, firefighters and other workers who keep Coeur d’Alene running will soon have more places to buy a home in the community where they work. About 104 homes are being planned to be built at Atlas Waterfront, on roughly 10 acres that are part of a swath of land that was once home to the Atlas sawmill and is being redeveloped. Ignite CDA, the city of Coeur d’Alene’s urban renewal agency, is leading this effort.