Moses Lake receives state money for upgrades of two wells
CHERYL SCHWEIZER | Hagadone News Network | UPDATED 10 months AGO
Senior Reporter Cheryl Schweizer is a journalist with more than 30 years of experience serving small communities in the Pacific Northwest. She began her post-high-school education at Treasure Valley Community College and enerned her journalism degree at Oregon State University. After working for multiple publications, she has settled down at the Columbia Basin Herald and has been a staple of the newsroom for more than a decade. Schweizer’s dedication to her communities and profession has earned her the nickname “The Baroness of Bylines.” She covers a variety of beats including health, business and various municipalities. | June 2, 2025 5:51 PM
MOSES LAKE — Two wells in Moses Lake will receive a combined $982,000 in rehabilitation and upgrades with the help of the state capital budget. Moses Lake Mayor Dustin Swartz said it’s work that needs to be done.
“There’s an element of deferred maintenance,” Swartz said.
The city received $810,000 to address contamination in one well and $172,000 for a new pump for a second well. Swartz said the goal in one case is to improve water quality, and in the second case, increase the well’s efficiency, and make water use in general more efficient.
Swartz said the $810,000 will go toward eliminating possible PFAS – a group of chemicals that resist grease, oil, water and heat according to the U.S. Food and Drug Administration – contamination in Well 29, located near the Grant County International Airport. According to the U.S. Environmental Protection Agency, PFAS are widely used in industry and take a long time to break down.
To date research has shown that exposure to certain levels of PFAS can have harmful health effects, according to the EPA website, although research is continuing into “how harmful PFAS are to people and the environment.”
The airport is the site of the Larson Air Force Base, where PFAS chemicals were in use for more than a decade. The chemicals are present in Well 29, at least intermittently. Swartz said city officials regularly test for PFAS.
“The odd thing about PFAS contamination is that it’s sporadic,” Swartz said.
Sometimes the well meets the EPA criteria for drinking water for five individual chemicals, which is four to 10 parts per trillion, depending on the chemical. The well is tested for combinations of chemicals and sometimes it meets the criteria. Sometimes it doesn’t.
“Full disclosure, we’ve exceeded those levels,” Swartz said.
Tests on Well 29 have detected up to 50 parts per trillion, he said.
According to state drinking water regulations, 10 ppt is the maximum allowed for water to be considered potable.
City officials want to keep operating Well 29, Swartz said.
“This well is a much better producer and has a more sustainable water supply,” he said.
As a result, city officials want to add more filtration at the wellhead to allow the well to stay in use.
“We’re already taking steps to clean it up,” Swartz said.
Well 17 needs a new pump, and Swartz said city officials want to make it more sustainable and more efficient. The money will be used to design the new installation and to pay at least some of the costs of construction, Swartz said.
“Water is something we’re very conscious about now,” he said.
Water availability will become more important as Moses Lake continues to grow, Swartz said, and city officials want to ensure an adequate water supply.
“We don’t want to slow that (growth) down,” he said.
The money was allocated in the state’s capital budget, which, said Representative Tom Dent, R-Moses Lake, is for capital projects, as its name implies.
“The tangible things. That’s what the capital budget is for,” Dent said.
Each legislator is allowed to submit requests for money, which come from constituents, in Dent’s case, from the 13th Legislative District.
“I can’t tell you how many capital budget requests I had. A lot,” Dent said.
That requires legislators to make some choices. Moses Lake received all the money it requested for the two well projects, Sen. Judy Warnick, R-Moses Lake, said that for her, it was a pretty easy decision.
“I have no problem funding and supporting those types of projects. Any issues with water, that’s a passion of mine,” she said.
ARTICLES BY CHERYL SCHWEIZER
Road closures, roundabout, mean construction season underway
EPHRATA — The grass is starting to turn green, the trees are starting to leaf out, construction crews are starting to build roundabouts – hey, it’s spring. At least one roundabout project is in its final phase, held over from fall 2025. The intersection of State Route 282 and Nat Washington Way will be closed the week of April 6 to allow crews to install permanent lights. “This really is the final (closure),” wrote Grant County Administrator Tom Gaines in a media release. “The roundabout will close at 6 a.m. Monday, and we plan to reopen by Friday, possibly sooner if the work finishes early.”
Ybarra announces run for Washington Senate
QUINCY — State Representative Alex Ybarra, R-Quincy, has announced his candidacy for the Washington Senate. If he’s elected, he would replace Judy Warnick, R-Moses Lake, who announced her retirement in March.
Othello Community Museum to open April 25
OTHELLO — With a couple of new exhibits, a new heating-cooling system, rearranged displays and a thorough cleaning, the Othello Community Museum will open for the summer April 25. The goal, said Molly Popchock, museum board secretary, is to operate for a full season.