Ephrata installs new sewer liner
NANCE BESTON | Hagadone News Network | UPDATED 1 month, 1 week AGO
EPHRATA – After more than 70 years, the Ephrata sewer line has gotten a brand-new sewer liner. The project impacted about 14,000 feet of sewer line and cost a bit under $1 million.
“We have a history of some sewer lines that were installed in the 50s. Over the past several years, there seems to be one that collapses every year,” City Administrator Ray Towry said. “This project was specifically to hit those lines. It was common practice to use concrete piping back many, many years ago, and what we've learned is that the gases that are emitted by the sewer actually eat away at that concrete, so the tops of those pipes actually just erode from that.”
Towry said there were several parts to the sewer line where there was no top and the ground just formed around where the concrete had been.
“We were just fortunate that as the ground and the rock had settled, it kind of settled into a natural arch. The roof was falling off slowly and being carried down with all of the sewer,” Towry said.
The project started with the sewer lines being filmed to assess the conditions throughout the city. The video showed that there were several areas that needed repair, according to Towry.
The city ended up adding a new sewer liner to around 14,000 feet of sewer line, which cost the city around $998,000. The process also included cleaning out the entire sewer line, videos of before and after, and the actual liner itself.
“We had a company come in, and they are able to run a pliable material from one manhole to the other, pressurize it and heat it with steam, which causes it to then harden into a PVC-like material,” Towry said. “That lines the inside of the pipe, so you don't have to do any of the excavation, you don't have to shut down traffic. You're not cutting into your roads or your streets. It's just a really slick process, just much quicker, much easier, much faster, a lot less disruption.”
Towry said this should cut down on any issues with the sewer.
“People in the Northeast section, it seems like annually there was a street or a road that we'd have to close off for a few days while we dug up a line and put in a new pipe,” Towry said. “So, this should alleviate that. That's our hope. Unless there's some issues out there that we weren't able to see on the camera. But we don't think that's the case. We think that we have got everything. We think this is a much, much less expensive and much less intrusive, proactive approach to taking care of this.”
ARTICLES BY NANCE BESTON

New principal takes charge at Warden High
WARDEN — Warden High School has welcomed its new principal, Heather Cheek, a seasoned educator with a passion for empowering students and fostering a positive school culture. Cheek, who assumed her role less than a week ago, brings a wealth of experience, having previously taught Spanish and served as an assistant principal in other districts. Cheek’s journey into education began with her desire to connect with others through language.

Ephrata mayoral candidates debate issues
EPHRATA – Ephrata Mayoral candidates came to the Columbia Basin Herald office Monday to talk about their positions on the issues. Incumbent Bruce Reim and opponent Steve Oliver answered questions around transparency, tax burdens, criminal activity and the local economy.

Ephrata summer school keeps students learning
EPHRATA — As the summer season wraps up, 190 students in the Ephrata School District are proving learning doesn't cease when the school year ends. The district’s summer school program, now in its final week, drew 136 Kindergarten through sixth-grade students to participate in enriching activities designed to bolster academic skills. "We aim to keep their skills up over the summer months and foster an ongoing curiosity about learning," said Director of Teaching and Learning Sharon Scellick. "We want to avoid the summer slide and keep our students active and engaged."