- Relevance
- Date
- Any time
- Past 24 hours
- Past week
- Past month
- Past year
Sort By
Date
All results /
Legals July 26, 2017
MITIGATED DETERMINATION OF NON-SIGNIFICANCE Name of proposal: Dynamic Food Ingredients "DFI" File Number: LUA2017-0024 Description of proposa:l The proposal is to remodel buildings at the former sugar beet plant into a manufacturing facility for Erythritol. The proposal includes using well water from Central Terminals and discharging process water to the existing Central Terminals ponds. Site work also includes grading and installing oundations for processing equipment such as cooling towers, chillers, HVAC, and storage tanks. Proponent: Dynamic Food Ingredients Corp. "DFI'', 1107 Hazeltine Blvd STE 470, Chaska, MN 55318 Location of proposal: 13583 Wheeler Rd NE, Located south of Wheeler Road and described as Parcel Central Terminals Major Plat IBSP, Prelim Central Terminals IBSP 151 Amendment. Parcel# 091121630 Lead agency: City of Moses Lake he lead agency for this proposal has determined that it does not have a probable significant adverse impact on he environment provided the following mitigation measures listed below are complied with. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). The decision was made after review of a completed checklist and other information on file with the lead agency. This information is available to the publi upon request. Mitigation Requirements: 1. During construction, any release of oil, hydraulic fluids, fuels, other petroleum products, paints, solvents, or other deleterious materials must be contained and removed in a manner that will prevent thei discharge into water or soil. The cleanup of spills shall take precedence over other work on the site. The proponent shall use best management practices for controlling and treating stormwater in compliance with the water quality and quantity standards of the Stormwater Management Manual for Eastern Washington and shall meet the state's non-endangerment standard for groundwater. Drywells and othe under ground injection control devices for managing stormwater are required to be regi stered with the Department of Ecology and comply with Ecology Publication 05- 10-067, "Guidancefor UIC Wells tha Manage Stormwater." Documentation of compliance with the Manual and Publication 05-10-067 and o how the non- endangerment standard will be met for street drainage shall be submitted to the Municipal Services Department before street construction plans are approved, in cluding sufficient studies and analysis to show that the vadose zone has ade quate treatment capacity for the minimal separation distance, as groundwater a nd other limiting layers is known to be high in this area. Documentation o compli ance with the Manual and Publication 05-10-067 and of how the non- endangerment standard will be met for on-site drainage shall be submitted to t he Building Official before building permits ar approved, including sufficient studies and analysis to show that the vadose zone has adequate treatmen ca pacity for the minimal separation distance. 3 Since ground disturbance leads to weeds and dust, the portions of thesite not proposed for developmen as part of the current project shall rmain undisturbed as much as possible. A stabilization plan shall be sub mitted to the Community Development Department before any site disturb ance is authorized. The plan shall address dust, erosion, and sediment control measures, both during construction and to permanently stabilize disturbed areas. At a mini mum, the plan shall identify the limits of disturbance, provide an area for sediment collection for on-site stormwater, address dust con trol during construction and non-working hours until project completion, identify and protect down-gradient areas from stormwater impacts, identify cut and fill slopes and possible check dams in ditched areas, identify and use secondary containment for on-site fueling tanks if present, and address construction en trance, stabilization after construction , inspection and maintenance of erosion control measures, and prevention of tracking sediment onto City streets and/or sidewalks. Temporary control measures are to be removed within 30 days of project completion. Disturbed areas that will not be built on, pav ed, removed, or landscaped for more than 45 days shall be stabilized through long-term methods such as establishing dryland grasses or native shrub/steppe. No building permit shall be issued until the plan has been approved by the Building fficial. The pro ponent shall ensure that nuisances, such as weeds and dust, do not develop. If the erosion control measures proposed by the applicant are found to be insuffi cient during the course of the project, the applicant shall immediately implement further erosion control measures. 14. The proponent shall retain sediment on site and employ measures to prevent tracking of material ontc City streets during construction, through measures such as an appropriately sized and designed construction entrance. The propo nent shall submit a proposal to the Building Official for review and approval be fore construction begins. 5. The proponent shall comply with all Air Quality requirements of the Department of Ecology. 16. The proponent shall comply with all fire protection and hazardous materials require ments of the Moses lake Fire Department and Building Division. 7. Before any permits are issued, the proponent shall apply for and pay a hazard ous materials permit from the Fire Department. 8. Archaeological sites are subject to the National Historic Preservation Act, as amended (16USC470), RCW 27.44 (Indian Graves and Records}, RCW 27.53 (Archaeological Sites and Resources), and WAC 25-48 (Archaeological Excava tion and Removal Permit). If anything of possible archaeological interest is un covered during excavation or other development, all work shall immediately stop and the proponenl shall notify the City, the Washington State Department of Ar chaeology & Historic Preservation (DAHP), and the Colville Confederated Tribes. Before work can resume, all requirements of the DAHP must be met. 9. The proponent shall ensure that all contractors and sub-contractors are aware of the relevant conditions. Mitigated Determination of Non-Significance (MONS) Comment Period: This MONS is issued under 197-11- 340(2); the lead agency will not act on this proposal for 14 days from the date below. Comments must be !Submitted by August 4th to the Responsible Official. Responsible Official: Gilbert Alvarado, P.O. Box 1579, Moses Lake, WA, 98837; (509)764-3747 ____ Date: July 21, 2017 Signature: GA _ Appeals You may appeal this determination to the Moses Lake Planning Commission, P. 0. Box 1579 (321 S. Balsam}, Moses Lake, WA 98837, no later than August 4, 2017 by writing to the Responsible Official at the above address. You should be prepared to make specific factual objections. Contact Gilbert Alvarado to read or ask about the procedures for SEPA appeals. #07051/99878 Pub:July 26, 2017
Mattawa Chamber hears about JustServe
MATTAWA - The Mattawa Area Chamber of Commerce heard about a new volunteerism organization from resident Jef Gallacci.
Bigfork students take lead in tech education
Hans Bodenhamer has a vision for the future.
Bigfork ready to battle over green boxes
Determined to keep their green-box refuse site, Bigfork residents plan to ask the Flathead County Solid Waste Board for a three-year moratorium on further green-box closures to allow for a comprehensive study of how the county should collect trash.
Walmart sells majority stake in Japanese Seiyu supermarket
TOKYO (AP) — U.S. retailer Walmart is selling off 85% of its wholly owned Japanese supermarket subsidiary Seiyu, while retaining a 15% stake, in a deal valued at 172.5 billion ($1.6 billion), the companies said Monday.
Walmart sells majority stake in Japanese Seiyu supermarket
TOKYO (AP) — U.S. retailer Walmart is selling off 85% of its wholly owned Japanese supermarket subsidiary Seiyu, while retaining a 15% stake, in a deal valued at 172.5 billion ($1.6 billion), the companies said Monday.
Walmart sells majority stake in Japanese Seiyu supermarket
TOKYO (AP) — U.S. retailer Walmart is selling off 85% of its wholly owned Japanese supermarket subsidiary Seiyu, while retaining a 15% stake, in a deal valued at 172.5 billion ($1.6 billion), the companies said Monday.
Cedar Street Bridge launching public market
SANDPOINT — We all know of the Cedar Street Bridge and how beautifully open it is, and what a great locale for enjoying the spectacular setting we call home, said Sandpoint Farmers Market director Patty Fulton.
Black Friday crowds cram into Black Sheep
Shoppers flood Cd'A malls seeking best holiday deals
Parking lots were packed and checkout lines were long throughout Coeur d’Alene on Black Friday, as shoppers sought the best deals for everyone on their Christmas lists. Thousands of people had reportedly streamed through the Silver Lake Mall by noon — and the place had only been open for two hours.
Man gets probation in puppy drownings
A retired Kalispell doctor convicted of abandoning 12 puppies, including 10 that had been drowned, at the green-box site in Somers last summer has been given probation.
Yesterdays
60 Years Ago
New tipping fee causes garbage rift
A brouhaha between Lake County and Republic Services over a fee hike spilled over into the commission chambers and Leader editorial pages recently, with the disposal service accusing the county of “double dipping” by invoicing them for what’s known in the industry as a “tipping fee.”
Yesterdays
60 Years Ago
Yesterdays
60 Years Ago
Brokers fight data sharing
Several weeks ago we suggested, when looking for real estate, you begin with your local Multiple Listing Service instead of the well advertised third-party sites. The top reason for our recommendation was accuracy. Often the third-party aggregators will have the same address listed more than once with different prices, or different status than is factual.
Pollution education for the next generation
COEUR d'ALENE — Moira DuCoeur's third-grade students chattered with excitement as a new storm drain marker was spray-painted outside their school Thursday.
Remembering the day the volcano blew
MOSES LAKE — It’s been 43 years since Mt. St. Helens erupted, spewing ash across vast swaths of the Pacific Northwest, covering towns, roads and fields of crops, and permanently changing the lives of many for days and weeks to follow. “It was just everywhere. People put pans out. They were shoveling it,” said Stephanie Massart, the regent of the Karneetsa Chapter of the National Society of the Daughters of the American Revolution in Moses Lake. “People were using wheelbarrows to put it out on the street and dump trucks would come pick it up.”
Get your local on
It’s pretty amazing when you stop and look at all the things the Flathead Valley is known for. Whether it is destinations like the “Crown of the Continent” that Glacier National Park has become known as, to Flathead Lake, Flathead River, the Jewel Basin and so many more places. Or perhaps it is products like Flathead cherries and huckleberries, microbreweries and distilleries or even the firearms industry that has been making waves, from parts and pieces to complete rifles manufactured here. Even more, perhaps it’s the activities like skiing on Big Mountain, snowmobiling on the Flathead National Forest or fishing on Flathead Lake or the dozens of other lakes in the region.
A time to slow down and reflect
I can’t believe the holidays are nearly here!
Bonner County History - Oct. 15, 2023
Bonner County Historical Society and Museum shares interesting stories of the community's people, places, and events.